Zabbougha
Timeline: On-going | Value: $1.000.000
Concrete works and finishing works.
COLLEGE LOUISE WEGMANN
Client: College Louise Wegmann | Timeline: 4 months | Value: $400.000
Interior, finishing, electro mechanical , electrical installation, partitioning, tiling etc…
ENTRANCE RENOVATIOM
Client: Private Client - Sursok | Timeline: 4 months | Value: Confidential
Addition of water features, change of floor, ceiling, addition to landscaping
DCC HORSE STABLE
Client: Dbayeh Country Club | Timeline: 6 months | Value: $200.000
Infrastructure, concrete, masonry, plaster, paint, steel structure, roof sandwich panels, aluminum, floor tiles, electrical installation, soft and hard landcaping, pergola
FACADE REPAIR AND WATERPROOFING
Client: Saifi 311 | Timeline: 3 month | Value: $150.000
Following August 4th’s explosion, repair of aluminum profile, cleansing of broken glass and application of silicone around all glazing to prevent the water leak. Replacement of all accessories and deteriorated handles (around 750 windows)
STAMPED CONCRETE
Client: Rosaire school | Timeline: 10 days | Value: $15.000
Stamped concrete for an area of approximately 600m2
BUILDING ELEVATOR ADDITION
Client: CIS | Timeline: 6 months | Value: $120.000
Addition of a concrete shaft to an existing building, size 2.2x2m. Cutting for door ooenings in concrete, electrical installation for elevator and Installation of an elevator with 11 stops. Facade renovation and painting
ENTRANCE RENOVATION
Client: CIS | Timeline: 2 months | Value: $40.000
Cutting of the existing ceiling and pouring of a new slab to increase the height of the entrance. Installation of floor tiles, Stone cladding, electrical installation, AC, waterproofing works, paint, glass and automatic sliding door installation
HARD LANDSCAPING VILLA
Client: Georges Abboud | Timeline: 1 month | Value: $30.000
Waterproofing, insulation and stamped concrete in addition to electrical installations
SHOWROOM
Client: Retail.com | Timeline: 1 month | Value: $20.000
Microtopping to floors, electrical works, ventilation and air conditioning, wood works, change of facade (glazing + ACP)
APARTMENT FIT OUT
Client: Private | Timeline: 10 months | Value: $500.000
Complete fit out works for a 500 m2 apartment in Abdel Wahab 618 tower including: masonry, plaster, waterproofing, electrical, HVAC, false ceiling, tiling, painting, kitchen, doors and closets, bathrooms.
20K POWER STATION
Client: Private House - Ghineh | Timeline: 2 months | Value: $50.000
Installation of a 25kwp OnGrid photovoltaic solution for a private house including steel mounted structure, around 80 PV panels, inverter and all necessary wiring and electrical installation.
FACADE RENOVATION
Client: Samaya - Kaslik | Timeline: 4 months | Value: $150.000
Concrete repair of all the balconies and upstands in addition to changing all the glass balustrade.
BAABDAT
Timeline: 4 months | Value: $150.000
Waterproofing repair and facade repair, stone cladding, plastering etc…
MAR ELIAS ANTELIAS THEATRE
Timeline: 3 months | Value: $70.000
Floor and walls carpets + sound insulation, electrical works, air conditioning, change of false ceiling and lighting and chairs, wood works for the stage and the walls, paint and tiling for the backstage.